Tunnel 2D O´Donnell (Madrid) Metro Station


Tunnel in Madrid following the German (core-heading) method. Steps: excavation of terrain, concrete placing, top heading, inner core and construction of keystone, gables and invert. The material activation/deactivation tool is used to analyse the constructive process

Company: Ingeciber

Country: Spain

Download