Tunnels, train sheds and station shafts were analyzed. The analysis included post stressed covering slab from bottom station shaft, Inner lining of the station shaft with fiber reinforced concrete, concrete pouring for post stressed covering slab, trench walls for TBM opening and walls and reinforced covering slab of train sheds.
Company: UTE LĂnea 9.
Country: Spain
Download